久久亚洲中文字幕精品有坂深雪,欧洲精品无码一区二区三区在线播放,日韩人妻无码精品系列专区,青青草原精品国产亚洲AV

自上料攪拌車廠家直銷

品質創(chuàng)造未來,愛上中科聚峰造

全國咨詢熱線
400-879-1999
當前位置:首頁 »新聞中心 » 行業(yè)動態(tài)自上料攪拌機的正常運行要注意哪些環(huán)節(jié)?

自上料攪拌機的正常運行要注意哪些環(huán)節(jié)?

來源:http://m.zvmc.cn 瀏覽:0發(fā)表時間:2021-03-03
中科自上料攪拌機主要由攪拌主機、物料稱量系統(tǒng)、物料輸送系統(tǒng)、物料貯存系統(tǒng)和控制系統(tǒng)等5大系統(tǒng)和其他附屬設施組成。 由于樓骨料計量與站骨料計量相比,減少了四個中間環(huán)節(jié),并且是垂直下料計量,節(jié)約了計量時間,因此大大提高了生產(chǎn)效率。
The concrete mixer is mainly composed of mixing host, material weighing system, material conveying system, material storage system and control system and other ancillary facilities. Compared with the station aggregate measurement, the building aggregate measurement reduces four intermediate links, and the vertical cutting measurement saves the measurement time, so the production efficiency is greatly improved.
混凝土攪拌機的正常運行要注意哪些環(huán)節(jié)呢?對此你了解多少呢?今天小編就這個問題給你介紹一下,希望對你有所幫助。
What should be paid attention to in the normal operation of concrete mixer? How much do you know about it? Today, I'd like to give you a brief introduction of this issue, hoping to help you.
1、混合器正在運行:
1. Mixer running:
1)向攪拌筒加料應在運行中進行;添加新材料只能在攪拌機中所有的原混凝土卸載后進行。除反向卸料外,不要中途停止攪拌機或在攪拌機滿載時啟動攪拌機。
1) Adding materials to the mixing drum should be carried out in operation; adding new materials can only be carried out after unloading all the original concrete in the mixer. Do not stop the mixer halfway or start the mixer when the mixer is full except for reverse discharge.
2)進料時,嚴禁將頭或手伸入料斗和機架,操作時不得用手或工具等東西伸入攪拌筒扒料卸料。
2) When feeding, it is strictly forbidden to put the head or hand into the hopper and frame. When operating, it is not allowed to put the hand or tools into the mixing drum to pick up and discharge materials.
3)作業(yè)時,如故障不能繼續(xù)運行,應立即切斷電源,將攪拌筒內(nèi)的混凝土清理干凈。
3) During the operation, if the fault can not continue to run, the power supply shall be cut off immediately and the concrete in the mixing drum shall be cleaned up.
               中科混凝土攪拌機
4)料斗上升時,禁止在料斗下工作或行走。料坑底部應為料斗提供一個枕頭,在清理料坑時,料斗應使用鏈條固定。
4) When the hopper rises, it is forbidden to work or walk under the hopper. A pillow shall be provided for the hopper at the bottom of the pit. When cleaning the pit, the hopper shall be fixed with a chain.
2、攪拌機運行前:混凝土攪拌機運行前后,傳動機構、工作裝置、制動器等。應進行可靠的檢查和緊固,以確保正常運行。大齒圈、皮帶輪等部件上應安裝防護罩,攪拌筒、支撐傳動和運動部件以及倉門、斗門和軌道內(nèi)不得有異物卡住。
2. Before mixer operation: before and after concrete mixer operation, transmission mechanism, working device, brake, etc. Reliable inspection and fastening shall be carried out to ensure normal operation. The big gear ring, belt pulley and other parts shall be installed with protective cover, and the mixing drum, supporting transmission and moving parts, as well as the bin door, bucket door and track shall not be jammed by foreign matters.
3、攪拌機運轉后:當混凝土攪拌完成或預計停止1小時以上時,除了排出剩余的材料外,還應將石頭和清水倒入振動桶中,并打開攪拌機,將附著在桶上的砂漿清洗干凈后排出。桶內(nèi)不得有積水,以防桶和葉片生銹。同時,還應清理攪拌筒外積聚的灰塵,以保持機器的清潔和完好。
3. After the operation of the mixer: when the concrete mixing is completed or is expected to stop for more than 1 hour, in addition to discharging the remaining materials, stones and clean water should also be poured into the vibrating bucket, and the mixer should be turned on to clean the mortar attached to the bucket before discharging. There shall be no water in the bucket to prevent the bucket and blade from rusting. At the same time, the dust accumulated outside the mixing drum should be cleaned to keep the machine clean and intact.