久久亚洲中文字幕精品有坂深雪,欧洲精品无码一区二区三区在线播放,日韩人妻无码精品系列专区,青青草原精品国产亚洲AV

自上料攪拌車廠家直銷

品質(zhì)創(chuàng)造未來,愛上中科聚峰造

全國(guó)咨詢熱線
400-879-1999
當(dāng)前位置:首頁(yè) »新聞中心 » 公司新聞混凝土自上料攪拌車廠家根據(jù)制動(dòng)系統(tǒng)升級(jí)

混凝土自上料攪拌車廠家根據(jù)制動(dòng)系統(tǒng)升級(jí)

來源:http://m.zvmc.cn 瀏覽:0發(fā)表時(shí)間:2021-12-03
為提高自動(dòng)上料攪拌車制動(dòng)系統(tǒng)的可靠性,混凝土自上料攪拌車廠家制動(dòng)系統(tǒng)建議對(duì)以下幾個(gè)方面進(jìn)行升級(jí):
In order to improve the reliability of the brake system of the agitator truck, the brake system of the agitator truck should be upgraded in the following aspects:
1.自動(dòng)上料攪拌車制動(dòng)氣壓管由單管改為雙管,提高了系數(shù)。
1. The brake pressure pipe of automatic feeding mixer is changed from single pipe to double pipe, which increases the Factor of safety. 
2.增加空氣壓縮機(jī)組合閥的鐵管長(zhǎng)度,采用多個(gè) U形布置,以提高出氣冷卻效果,以及裝載機(jī)減組合閥橡膠密封圈的老化。
2. Increase the iron pipe length from the Air compressor to the combination valve, using multiple u-shaped arrangements to improve outlet air cooling, and loader to reduce the aging of the combination valve rubber seal ring. 
3.將目前使用的組合閥更換為帶干燥器的調(diào)節(jié)器,以便在自動(dòng)上料攪拌車損壞后進(jìn)行維修,以減少儲(chǔ)氣罐的積水。
3. Replace the current combination valve with a regulator with a dryer for repair after the agitator truck is damaged to reduce water in the tank. 
4.自動(dòng)上料拌和車在氣頂油制動(dòng)系統(tǒng)中,加力器是一個(gè)非常關(guān)鍵的部件,其儲(chǔ)液罐要加一個(gè)報(bào)警裝置??刹捎靡韵聝煞N結(jié)構(gòu),混凝土自上料攪拌車廠家采用液位報(bào)警,用浮動(dòng)閥和舌簧開關(guān)檢測(cè)制動(dòng)液液面高度,及時(shí)報(bào)警,采用行程報(bào)警,若加力器活塞行程過大,說明制動(dòng)系統(tǒng)有故障。
4. In the air-top oil brake system of the automatic feeding mixer, the afterburner is a very important component, and an alarm device should be added to its liquid storage tank. Can Be used in the following two structures, concrete self-loading mixer factory use liquid level alarm, use floating valve and spring switch detection brake liquid level, timely alarm, use stroke alarm, if the booster piston stroke is too large, it means there’s something wrong with the brake system. 
5.為了減少儲(chǔ)氣罐積水,將目前使用的組合閥更換為帶干燥器的節(jié)器。
5. In order to reduce the accumulation of water in the gas storage tank, the combination valve currently in use is replaced by an economizer with a dryer.